Totally remodeled to create an open concept. New stainless appliances and cabinets in kitchen. Used stainless refrigerator on the porch. City water filter and brand new water softener with UV/sun cover for protection. New ensuite primary
bathroom. Updated/added lighting, ceiling fans, A/C duct work repaired in 2023, blown in insulation added 11/2023,
USB charging outlets and electric per building code. New windows end of 2023/2024, new roof 2021, new deck attached to garage, added additional driveway/parking, updated garage/shed with concrete foundation. New water filtration/treatment
system, updated hall bathroom, added canopy in driveway, updated laundry room, closed in carport. Added concrete stain
to lanai and new screen. Generator outlet and water heater timer was installed. Generator is included. New irrigation system and timer. Kwikset SmartKey entry lockset added, you can programs and use your own key.
Come see the Chalkboard in the Kitchen!