One or more photo(s) has been virtually staged. Pre-Construction. To be built. Brand new Maronda Homes Victoria M3 plan with estimated completion date of Nov 2024. CBS construction
with full builder warranties. Terrific plan featuring large great room, stone accented front elevation, solid surface tops in
kitchen, extensive ceramic tile flooring, refrigerator, blinds and much, much more.
Listing
Street
Satellite
Exterior Features
Construction Single Family Residence
Siding Block, Stone, Stucco
Roof Shingle
Garage No
Water Public
Sewer Public Sewer
Lot Description Paved
Interior Features
Appliances Dishwasher, Disposal, Electric Water Heater, Range
Heating Central, Electric
Cooling Central Air
Basement Slab
Year Built 2023
Neighborhood & Schools
Subdivision HARMONY CENTRAL
Financial Information
Parcel ID 32-26-32-3596-000B-0160
Zoning RES
Listing Information
Properties displayed may be listed or sold by various participants in the MLS.